About The Project

On May 23, 2024, Sienna acquired the “Case Lake West Cesium and Spodumene Pegmatite Project”, located in the Larder Lake Mining division of Ontario, Canada, roughly 100 km north of Kirkland Lake, NE Ontario.  This project consists of approximately 2,200 contiguous acres prospective for Cesium and Spodumene Pegmatites directly bordering Power Metals Corp’s (TSX.v: PWM) Case Lake cesium and pegmatite swarm discovery. On May 22, 2024 Power Metals announced “WORLD-CLASS CESIUM RESULTS UP TO 18.13% AT CASE LAKE.”  .

Jason Gigliotti, President of Sienna states, “Management is pleased to be able to acquire the Case Lake West Cesium and Spodumene Pegmatite Project directly bordering Power Metal’s Case Lake discovery.  This area is very active currently and Management is looking to start operations as soon as possible. With the significant announcement by Power Metals on May 22, 2024 of their ‘World-class cesium results…’ Sienna’s management is encouraged by these important results achieved directly bordering our property. Ontario is one of the most well-known mining regions in the world, and we are very pleased to have a large footprint in the heart of it.  Management is very optimistic about the remainder of the year and how the overall tenor of the junior market is improving.  Sienna has been building a strong portfolio of Canada focused assets in 2024 primarily in Uranium and now for Cesium and Lithium.   Sienna management plans to continue and build on this trend in the future.”

Management cautions that past results or discoveries on properties in proximity to Sienna may not necessarily be indicative to the presence of mineralization on the Company’s properties. Mr. Frank Bain, P.Geo., a Qualified Person as defined by National Instrument 43-101 has reviewed and approved the scientific and technical disclosure contained within this website.

More Information

Tel: 1.604.646.6900
Fax: 1.604.689.1733
www.siennaresources.com
[email protected]